Factory Consultation: Setup, Flow, Safety, Expansion
This page is for factory-focused consultation. Goal: production-flow clarity, safer movement, better zone utilization, and structured expansion planning.
4 Sub Categories of Factory Consultation
1) New Factory Setup Guidance
Layout foundation, entry/dispatch path, machine zoning, and supervision-point planning before execution.
Setup Consultation2) Running Factory Optimization
Optimization for running units with bottleneck areas, movement conflicts, and operation clarity improvements.
Optimize Running Unit3) Expansion / New Line Integration
Flow continuity and risk-control planning while adding expansion blocks or new production lines.
Plan Expansion4) Warehouse & Dispatch Flow
Raw material, finished goods, dispatch route, and loading/unloading logic for better throughput.
Improve Warehouse FlowRequired Inputs (Before Booking)
Layout & Space Data
- Factory layout map / CAD / sketch
- Entry, exit, loading points
- Machine and line positioning
Operations Data
- Material flow (inward to dispatch)
- Shift pattern and team movement
- Current bottlenecks / repeated issues
Consultation Flow
Book + submit layout and operation details.
Zone and movement analysis by workflow stage.
Consultation call with practical correction priorities.
Execution sequence + support-window follow-up.